TY - JOUR
T1 - A framework to assess success criteria performance of public private partnership (PPP) toll road projects in Indonesia
AU - Kristiawan, F.
AU - Rohman, M. A.
AU - Machsus,
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/11/3
Y1 - 2020/11/3
N2 - Public Private Partnership (PPP) is widely used to bridge infrastructure projects in the world. PPP arises as a result of the ongoing budget constraints faced by various governments and part of the limited private sector opportunities in infrastructure development. In Indonesia, the implementation of PPP has not been successfully implemented. In 2017, 22 PPP projects were offered, but only 5 projects were signed. According to previous studies, there are some problems related to PPP implementation in Indonesia. Referring to this, PPP project success criteria are very important to be defined to assess the success of this type of project. Data collection procedure consists of preliminary survey involving experts in the field to verify the research attributes, followed by main survey to collect respondents' perception regarding the attributes using Likert Scale. Importance Performance Analysis (IPA) is proposed to measure the performance of each success criterion in each respondent sector and followed by gap analysis to investigate critical gaps between them. The results of this paper are a methodological framework model that presents a gap implementation and a performance of the successful PPP criteria for toll road projects in Indonesia. These results can be used to assess the performance of PPPs in Indonesia.
AB - Public Private Partnership (PPP) is widely used to bridge infrastructure projects in the world. PPP arises as a result of the ongoing budget constraints faced by various governments and part of the limited private sector opportunities in infrastructure development. In Indonesia, the implementation of PPP has not been successfully implemented. In 2017, 22 PPP projects were offered, but only 5 projects were signed. According to previous studies, there are some problems related to PPP implementation in Indonesia. Referring to this, PPP project success criteria are very important to be defined to assess the success of this type of project. Data collection procedure consists of preliminary survey involving experts in the field to verify the research attributes, followed by main survey to collect respondents' perception regarding the attributes using Likert Scale. Importance Performance Analysis (IPA) is proposed to measure the performance of each success criterion in each respondent sector and followed by gap analysis to investigate critical gaps between them. The results of this paper are a methodological framework model that presents a gap implementation and a performance of the successful PPP criteria for toll road projects in Indonesia. These results can be used to assess the performance of PPPs in Indonesia.
UR - http://www.scopus.com/inward/record.url?scp=85096850133&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/930/1/012004
DO - 10.1088/1757-899X/930/1/012004
M3 - Conference article
AN - SCOPUS:85096850133
SN - 1757-8981
VL - 930
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 1
M1 - 012004
T2 - 4th International Conference on Civil Engineering Research, ICCER 2020
Y2 - 22 July 2020 through 23 July 2020
ER -