A model of owner estimate cost for software development project in Indonesia

Sholiq*, Apol Pribadi Subriadi, Feby Artwodini Muqtadiroh, Renny Sari Dewi

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

10 Citations (Scopus)

Abstract

The purpose of this study is to develop a model of owner estimate cost of software development projects. The model consists of three main components, namely, personnel direct costs, nonpersonnel direct costs, and taxes. Personnel direct costs are obtained by using the use case points (UCP) method that has been advanced. Initially, UCP was utilized to calculate the effort required to complete the software project. In this study, UCP was institutionalized to obtain personnel direct costs by distributing the acquired effort into each activity in a project. Further, the effort per activity is multiplied by the pay rate for each activity. Personnel direct costs are resulted by adding up the cost of all activities. The experiment has been conducted on nine software development projects in which the model is applied to get the estimated cost calculation.

Original languageEnglish
Article numbere2175
JournalJournal of software: Evolution and Process
Volume31
Issue number10
DOIs
Publication statusPublished - 1 Oct 2019

Keywords

  • owner estimate cost
  • personnel direct cost
  • software project
  • use case points