TY - GEN
T1 - A preventive maintenance policy based on system state information
AU - Endharta, Alfonsus Julanto
AU - Yun, Won Young
PY - 2014
Y1 - 2014
N2 - The paper considers a linear consecutive-k-out-of-n: F system and a linear connected-(r, s)-out-of-(m, n): F system. It is assumed that the components are identical and the failure times of components follow an Exponential distribution. The systems are inspected periodically to find failed components and if the system fails between inspection times, the failed components are replaced with new ones. If the system survives until inspection time points, the system state (component states) is inspected. A preventive maintenance policy is proposed and it is based on the criticality measure which is related to the number of failed components in minimal cut sets of systems. If the value of the criticality measure satisfies the predetermined condition at inspection times, the failed components of systems are replaced with new ones to prevent system failures in the next inspection interval. The expected cost rate is used as an optimization criterion. The expected cost rate is estimated by simulation and numerical examples are studied.
AB - The paper considers a linear consecutive-k-out-of-n: F system and a linear connected-(r, s)-out-of-(m, n): F system. It is assumed that the components are identical and the failure times of components follow an Exponential distribution. The systems are inspected periodically to find failed components and if the system fails between inspection times, the failed components are replaced with new ones. If the system survives until inspection time points, the system state (component states) is inspected. A preventive maintenance policy is proposed and it is based on the criticality measure which is related to the number of failed components in minimal cut sets of systems. If the value of the criticality measure satisfies the predetermined condition at inspection times, the failed components of systems are replaced with new ones to prevent system failures in the next inspection interval. The expected cost rate is used as an optimization criterion. The expected cost rate is estimated by simulation and numerical examples are studied.
KW - Condition-based maintenance
KW - Connected-(r,s)-out-of-(m,n) system
KW - Consecutive-k-out-of-n system
KW - Inspection
UR - https://www.scopus.com/pages/publications/84908323763
M3 - Conference contribution
AN - SCOPUS:84908323763
T3 - RQD 2014 - Proceedings - 20th ISSAT International Conference Reliability and Quality in Design
SP - 51
EP - 55
BT - RQD 2014 - Proceedings - 20th ISSAT International Conference Reliability and Quality in Design
A2 - Pham, Hoang
PB - International Society of Science and Applied Technologies
T2 - 20th ISSAT International Conference Reliability and Quality in Design, RQD 2014
Y2 - 7 August 2014 through 9 August 2014
ER -