A solution of preventive control by means of Transient Stability Constrained OPF

Lukmanul Hakim*, Junji Kubokawa, Yue Yuan, Rony Seto Wibowo, Tomohiro Takayama, Naoto Yorino, Yoshifumi Zoka, Yutaka Sasaki, Yusra Sabri

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

In the recently deregulated electricity market, a more secure of power system operation is essential. One of the methods to avoid the risk of compromising power system instability is preventive control which often comes in the form of generation rescheduling. This paper attempts to solve transient stability preventive control problem by generation redispatch utilizing the Primal-Dual Interior Point Method (PDIPM) Non Linear Programming (NLP) Transient Stability Constrained Optimal Power Flow (TSCOPF). A linear cost model is derived to accommodate generation redispatch. Our simulation shows that the proposed method is able to solve the transient stability preventive control problem by rescheduling necessary active power generation.

Original languageEnglish
Title of host publicationTENCON 2010 - 2010 IEEE Region 10 Conference
Pages2129-2132
Number of pages4
DOIs
Publication statusPublished - 2010
Externally publishedYes
Event2010 IEEE Region 10 Conference, TENCON 2010 - Fukuoka, Japan
Duration: 21 Nov 201024 Nov 2010

Publication series

NameIEEE Region 10 Annual International Conference, Proceedings/TENCON

Conference

Conference2010 IEEE Region 10 Conference, TENCON 2010
Country/TerritoryJapan
CityFukuoka
Period21/11/1024/11/10

Keywords

  • Generation rescheduling
  • Optimal power flow
  • Preventive control
  • Transient stability

Fingerprint

Dive into the research topics of 'A solution of preventive control by means of Transient Stability Constrained OPF'. Together they form a unique fingerprint.

Cite this