A system dynamic thinking for modeling infrastructure project duration acceleration

Yusroniya Eka Putri Rachman Waliulu*, Tri Joko Wahyu Adi

*Corresponding author for this work

Research output: Contribution to journalConference articlepeer-review

1 Citation (Scopus)

Abstract

This paper aims to determine the impact of accelerating duration on profits and contingency cost.The method using infrastructure project building in Surabaya Indonesia 2020 historical data set, followed by System Dynamic (SD) modeling and ending with a scenario of the relationship between project duration acceleration, addition profits and crashing cost.Project acceleration can improve project performance by considering the effect on profits and contingency costs,with Schedule Performance Index (SPI) up to 1.06 can increase profit between 1.05%-4.72% due to reduced in indirect costs,otherwise crashing cost will reduce contingency cost between 0.43%-1.91% of the contract value.

Original languageEnglish
Pages (from-to)420-427
Number of pages8
JournalProcedia Computer Science
Volume197
DOIs
Publication statusPublished - 2021
Event6th Information Systems International Conference, ISICO 2021 - Virtual, Online, Italy
Duration: 7 Aug 20218 Aug 2021

Keywords

  • Acceleration duration
  • Contingency cost
  • Infrastructure projects building
  • Profits
  • System dynamic