N2 - The construction of new shipyard in the Cilacap area is one of the best ways to reduce the accumulation of vessels. The construction of shipyard has many risks, one of the risks that can occur during the construction of the shipyard is in terms of cost and time. Project scheduling is a tool to make sure the project finished on time. This paper discusses project scheduling and cost calculation using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT) method for Graving Dock project development in Cilacap. Project scheduling is useful to indicate the relation of each activity to another. This paper will discuss the critical activities during Gravity Dock development and the duration for the whole project using CPM. The next step is to determine the probability of the completing project that can be finished within the time frame using PERT. Based on the CPM analysis, the probability of Graving Dock project can be finished in 204 days is 79,81 %. The total cost for Graving Dock project in Cilacap is Rp. 6.486.122.769.
AB - The construction of new shipyard in the Cilacap area is one of the best ways to reduce the accumulation of vessels. The construction of shipyard has many risks, one of the risks that can occur during the construction of the shipyard is in terms of cost and time. Project scheduling is a tool to make sure the project finished on time. This paper discusses project scheduling and cost calculation using Critical Path Method (CPM) and Program Evaluation Review Technique (PERT) method for Graving Dock project development in Cilacap. Project scheduling is useful to indicate the relation of each activity to another. This paper will discuss the critical activities during Gravity Dock development and the duration for the whole project using CPM. The next step is to determine the probability of the completing project that can be finished within the time frame using PERT. Based on the CPM analysis, the probability of Graving Dock project can be finished in 204 days is 79,81 %. The total cost for Graving Dock project in Cilacap is Rp. 6.486.122.769.
UR - http://www.scopus.com/inward/record.url?scp=85055335818&partnerID=8YFLogxK
U2 - 10.1051/matecconf/201817701028
DO - 10.1051/matecconf/201817701028
M3 - Conference article
AN - SCOPUS:85055335818
SN - 2261-236X
VL - 177
JO - MATEC Web of Conferences
JF - MATEC Web of Conferences
M1 - 01028
T2 - 5th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management, ISOCEEN 2017
Y2 - 8 November 2017
ER -