TY - JOUR
T1 - Design and Operating System of Floating Waste Treatment Facility in Belakang Padang
AU - Ali, M.
AU - Zaman, M. B.
AU - Prastowo, H.
AU - Pitana, T.
AU - Priyanta, D.
AU - Siswantoro, N.
AU - Busse, W.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2022/2/4
Y1 - 2022/2/4
N2 - The district of Belakang Padang consists of 108 islands. On these islands, 43 islands are inhabited and 65 islands are uninhabited. The source of pollution on this island comes from community activities on land, such as throwing garbage in the sea and so on. In this paper, Floating Waste Treatment Facility will be designed on Self-Propelled Barge (SPB) with principle dimension: Lpp = 13 m; B = 2.48 m; and T = 0.589 m. The barge can accommodate 7 tons of waste consisting of a garbage tank and a sorting process along with a plastic press machine to reduce the volume of plastic waste. In the calculation of the volume requirement for waste weighing 7 tons, that is 16.43 m3. With an estimated 9 hours of sorting work, it can meet the volume of waste needs. The total investment for the construction of this facility is Rp 362,087,076.12 and the annual operating costs are Rp 458,692,802.67. This facility is feasible to build because of the value of several economic metrics as follows: NPV Rp 488,234,793; IRR 26% and PI 2,348.
AB - The district of Belakang Padang consists of 108 islands. On these islands, 43 islands are inhabited and 65 islands are uninhabited. The source of pollution on this island comes from community activities on land, such as throwing garbage in the sea and so on. In this paper, Floating Waste Treatment Facility will be designed on Self-Propelled Barge (SPB) with principle dimension: Lpp = 13 m; B = 2.48 m; and T = 0.589 m. The barge can accommodate 7 tons of waste consisting of a garbage tank and a sorting process along with a plastic press machine to reduce the volume of plastic waste. In the calculation of the volume requirement for waste weighing 7 tons, that is 16.43 m3. With an estimated 9 hours of sorting work, it can meet the volume of waste needs. The total investment for the construction of this facility is Rp 362,087,076.12 and the annual operating costs are Rp 458,692,802.67. This facility is feasible to build because of the value of several economic metrics as follows: NPV Rp 488,234,793; IRR 26% and PI 2,348.
UR - http://www.scopus.com/inward/record.url?scp=85124839926&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/972/1/012053
DO - 10.1088/1755-1315/972/1/012053
M3 - Conference article
AN - SCOPUS:85124839926
SN - 1755-1307
VL - 972
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012053
T2 - 6th International Conference on Marine Technology, SENTA 2021
Y2 - 27 November 2021
ER -