Design of marine cable installation for ocean current power plant in Toyopakeh Strait-Bali

Adi Kurniawan, Mira Yosi, Irfan Syarif Arief, Danang Cahyagi

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

Toyopakeh Strait is located near Nusa Penida Island in the Province of Bali. Practical potential energy of ocean currents at that location is up to 320 MW. Tidal amplitude reaches more than 2.6 meters and ocean currents reach 3.40 m/s during the full moon, with the time duration is between 10-14 hours per day. This research is part of an ocean currents power plant technical study with a purpose to design of the subsea cable installation from plant to land. The method is determining the dimensions of the cable, dimensions of the pipe protector, stability analysis, and cable laying analysis. With the power of 3 kW, and the distance to the land is 280 m, conductor dimensions required is 3×2.5 m2 with 13 mm diameter of cable, while the pipe protector cable thickness is 2.77mm. Vertical stability protector pipe are 0.824 and the lateral stability are 0.373. From the results of these calculations can be assured that the pipes and cables meet the standards of stability.

Original languageEnglish
Title of host publicationProceeding - ICAMIMIA 2017
Subtitle of host publicationInternational Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages136-140
Number of pages5
ISBN (Electronic)9781538627297
DOIs
Publication statusPublished - 15 Jun 2018
Event2017 International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation, ICAMIMIA 2017 - Surabaya, Indonesia
Duration: 12 Oct 201714 Oct 2017

Publication series

NameProceeding - ICAMIMIA 2017: International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation

Conference

Conference2017 International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation, ICAMIMIA 2017
Country/TerritoryIndonesia
CitySurabaya
Period12/10/1714/10/17

Keywords

  • marine cable installation
  • ocean current power
  • pipe protector
  • stability
  • subsea cable

Fingerprint

Dive into the research topics of 'Design of marine cable installation for ocean current power plant in Toyopakeh Strait-Bali'. Together they form a unique fingerprint.

Cite this