Determination of the value of land in the phase preconstruction, construction and post-construction in the area of infrastructure development

I. Nyoman Dita Pahang Putra*, Nadjadji Anwar, Christiono Utomo

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

1 Citation (Scopus)

Abstract

The problem of land value agreement when the land acquisition for infrastructure development have occurred in Indonesia. This problem can occur in the pre-construction, construction and post-construction phases. The research objective was to identify patterns and changes of the value of land right in the area of infrastructure development and its surroundings. Linear regression and non-linear time series data with lot and block system were used to analyse the value of the land in each zone. The results of this study indicated that the average value of land in the area of infrastructure development (11 LVZ) increased much higher than that of land located in the area surrounding infrastructure development (67 LVZ). It increased sharply from pre-construction, construction to post-construction phases by 22:57%, 39.44%, 29.84% while the land value in the surrounding area of infrastructure development rose 14.83%, 14.83%, 14:46%. It is expected that the results of this study can contribute in determining the pattern of changes in the value of the land in other infrastructure development areas.

Original languageEnglish
Pages (from-to)6912-6919
Number of pages8
JournalARPN Journal of Engineering and Applied Sciences
Volume11
Issue number11
Publication statusPublished - 1 Jun 2016

Keywords

  • Construction
  • Land value
  • Post-construction
  • Pre-construction

Fingerprint

Dive into the research topics of 'Determination of the value of land in the phase preconstruction, construction and post-construction in the area of infrastructure development'. Together they form a unique fingerprint.

Cite this