Abstract
The accelerated retirement of coal-fired power plants (CFPPs) has become a key component in Indonesia's energy transition policy, especially within the Java Madura Bali power system. This study evaluates the technical impacts of early CFPPs retirement on frequency stability and transmission losses during the transition period from 2025 to 2030. Sequential scenario-based simulations were conducted using DIgSILENT PowerFactory, the study models projected retirements and large-scale integration of renewable energy sources across the regional grid. The results show that the immediate loss of synchronous inertia after CFPPs retirement leads to lower frequency nadir and higher risk of under-frequency events. Transmission loss analysis further reveals that the impact of early retirement is strongly influenced by the spatial distribution of both retired units and replacement generation. Specifically, retiring coal plants located far from major load centers can reduce overall losses when the replacement power plant is located closer to demand areas.
| Original language | English |
|---|---|
| Title of host publication | 26th International Seminar on Intelligent Technology and Its Applications |
| Subtitle of host publication | Fostering Equal Opportunities for Breakthrough Technology Innovations, ISITIA 2025 - Proceedings |
| Publisher | Institute of Electrical and Electronics Engineers Inc. |
| Pages | 825-830 |
| Number of pages | 6 |
| Edition | 2025 |
| ISBN (Electronic) | 9798331537609 |
| DOIs | |
| Publication status | Published - 2025 |
| Event | 26th International Seminar on Intelligent Technology and Its Applications, ISITIA 2025 - Hybrid, Surabaya, Indonesia Duration: 23 Jul 2025 → 25 Jul 2025 |
Conference
| Conference | 26th International Seminar on Intelligent Technology and Its Applications, ISITIA 2025 |
|---|---|
| Country/Territory | Indonesia |
| City | Hybrid, Surabaya |
| Period | 23/07/25 → 25/07/25 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 7 Affordable and Clean Energy
Keywords
- Early Retirement of Coal-Fired Power Plants
- Java Madura Bali Electrical Stability System
- Power Loss
Fingerprint
Dive into the research topics of 'Early Retirement of Coal-Fired Power Plants Impact on the Java Madura Bali System'. Together they form a unique fingerprint.Cite this