Abstract
The marine transportation of crude oil from tankers to final terminals is facilitated using pipelines and oil terminals. The predominant form of the terminal is the Single Point Mooring system. The system is crucial as it anchors tankers and transfers crude oil from the ship to the system using floating hoses. Thus, periodic inspections are needed on the Single Point Mooring structure during its lifespan. In an inspection, there was a finding the Single Point Mooring 17,500 DWT vessel required rapid overhaul. Acquiring a substitute Single Point Mooring (SPM) system with 150,000 DWT in capacity is necessary to ensure the uninterrupted continuation of crude oil loading and unloading activities. However, a different mooring system was found between these two. Thus, a redesign of the mooring system is configured and analyzed in this paper. This paper investigates the strength of the mooring lines and the triangle plates. The different positions of triangle plates are also compared to give recommendations for the mooring system. The research findings indicate that the mooring system design satisfies the API RP 2SK criterion, both intact and damaged.
| Original language | English |
|---|---|
| Article number | 012032 |
| Journal | IOP Conference Series: Earth and Environmental Science |
| Volume | 1461 |
| Issue number | 1 |
| DOIs | |
| Publication status | Published - 2025 |
| Event | 24th International Conference on Marine Technology, SENTA 2024 - Surabaya, Indonesia Duration: 31 Oct 2024 → 1 Nov 2024 |
UN SDGs
This output contributes to the following UN Sustainable Development Goals (SDGs)
-
SDG 14 Life Below Water
Keywords
- Damaged analysis
- mooring line tension
- single point mooring
- triangle plate
Fingerprint
Dive into the research topics of 'Effect of triangle plate positioning on mooring line tension of single point mooring system'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver