TY - JOUR
T1 - Effectivity analysis of the scrum framework adaptation in safety performance improvement
T2 - A system dynamics approach
AU - Sudiarno, Adithya
AU - Abdillah, Okto
AU - Yusdin, Hammam Dhiyaurrahman
AU - Ummatin, Kuntum Khoiro
AU - Murti, Izzati Winda
N1 - Publisher Copyright:
© 2024 by author(s).
PY - 2024
Y1 - 2024
N2 - The rapidly growing construction industry often deals with complex and dynamic projects that pose significant safety risks. One of the state-owned companies in Indonesia is engaged in large-scale toll road construction projects with a high incidence of workplace accidents. This study aims to improve safety performance in toll road construction by implementing the Scrum framework. The study uses a System Dynamics approach to model interactions between the Scrum framework, project management, and work safety subsystems. Various scenarios were designed by modifying controlled variables and system structures, including introducing a punishment entity. These scenarios were evaluated based on their impact on reducing incidents and the incident rate over the project period. The results indicate that the combined scenario significantly reduces incidents and incident rates in different conditions. The study also finds a strong relationship between Scrum framework implementation and improved safety performance, demonstrating a reduction in incidents and incident rates by over 50% compared to existing conditions. This research underlines the effectiveness of the Scrum framework in enhancing safety in construction projects.
AB - The rapidly growing construction industry often deals with complex and dynamic projects that pose significant safety risks. One of the state-owned companies in Indonesia is engaged in large-scale toll road construction projects with a high incidence of workplace accidents. This study aims to improve safety performance in toll road construction by implementing the Scrum framework. The study uses a System Dynamics approach to model interactions between the Scrum framework, project management, and work safety subsystems. Various scenarios were designed by modifying controlled variables and system structures, including introducing a punishment entity. These scenarios were evaluated based on their impact on reducing incidents and the incident rate over the project period. The results indicate that the combined scenario significantly reduces incidents and incident rates in different conditions. The study also finds a strong relationship between Scrum framework implementation and improved safety performance, demonstrating a reduction in incidents and incident rates by over 50% compared to existing conditions. This research underlines the effectiveness of the Scrum framework in enhancing safety in construction projects.
KW - construction projects
KW - safety performance
KW - scrum framework
KW - system dynamics simulation
UR - http://www.scopus.com/inward/record.url?scp=85204173920&partnerID=8YFLogxK
U2 - 10.24294/jipd.v8i9.7386
DO - 10.24294/jipd.v8i9.7386
M3 - Article
AN - SCOPUS:85204173920
SN - 2572-7923
VL - 8
JO - Journal of Infrastructure, Policy and Development
JF - Journal of Infrastructure, Policy and Development
IS - 9
M1 - 7386
ER -