Abstract
The problem occurs when p control chart for large sample size, the control limits are narrow and many observation will fall outside the control limits. To solve that problem, laney p’ control chart was proposed. The chart can maintain the problem of large sample size. However, there is no strong evidence said that the p’ control chart is better than p chart, for all condition of data. This paper will discuss the performance of p’ control chart based on graphic visualization and Average Run Length (ARL), then compare its performance with the conventional p control chart. The simulation process would be used to determine the performance of p and p’ control chart for all condition of sample sizes.
Original language | English |
---|---|
Pages (from-to) | 14208-14217 |
Number of pages | 10 |
Journal | International Journal of Applied Engineering Research |
Volume | 12 |
Issue number | 24 |
Publication status | Published - 2017 |
Keywords
- Average Run Length
- Laney p’ chart
- P chart