TY - JOUR
T1 - Factors influencing the application of health management systems of occupational safety and environment on green construction projects
AU - Gunawan, Ivan
AU - Wijayaningtyas, Maranatha
AU - Kartika, Deviany
AU - Winanda, Lila Ayu Ratna
N1 - Publisher Copyright:
© 2024 Author(s).
PY - 2024/3/26
Y1 - 2024/3/26
N2 - A construction project is a series of interrelated activities to achieve specific goals, especially in green construction projects, prioritise sustainable projects and create an environment that saves resources throughout the building's life cycle. Indirectly, the accident rate in this sector is also increasing. Within the scope of construction projects, the thing that needs to be considered is the accident rate. A good Occupational Safety and Health Management System can reduce or minimise accident rates in the construction project sector. The analysis results of the AHP method obtained with the help of expert choice that the priority order in the criteria is regarding equipment, the Implementation of Green Construction, then Audit and the last Environment. The highest weight means that in handling priority strategies in Health Management Systems of Occupational Safety and Environment management, then for alternative ranking priority scales in this management priority strategies, Standart for Evaluation and Revision is a priority, after that rank two, namely Controlling, and the last order is to carry out Equipment Maintenance.
AB - A construction project is a series of interrelated activities to achieve specific goals, especially in green construction projects, prioritise sustainable projects and create an environment that saves resources throughout the building's life cycle. Indirectly, the accident rate in this sector is also increasing. Within the scope of construction projects, the thing that needs to be considered is the accident rate. A good Occupational Safety and Health Management System can reduce or minimise accident rates in the construction project sector. The analysis results of the AHP method obtained with the help of expert choice that the priority order in the criteria is regarding equipment, the Implementation of Green Construction, then Audit and the last Environment. The highest weight means that in handling priority strategies in Health Management Systems of Occupational Safety and Environment management, then for alternative ranking priority scales in this management priority strategies, Standart for Evaluation and Revision is a priority, after that rank two, namely Controlling, and the last order is to carry out Equipment Maintenance.
UR - http://www.scopus.com/inward/record.url?scp=85190667031&partnerID=8YFLogxK
U2 - 10.1063/5.0204849
DO - 10.1063/5.0204849
M3 - Conference article
AN - SCOPUS:85190667031
SN - 0094-243X
VL - 3110
JO - AIP Conference Proceedings
JF - AIP Conference Proceedings
IS - 1
M1 - 020035
T2 - 4th International Conference on Green Civil and Environmental Engineering, GCEE 2023
Y2 - 8 August 2023 through 10 August 2023
ER -