Fast Missile Boat Project Planning using CPM and What if Analysis Method

Silvianita, R. Firmansyah, D. M. Rosyid, Suntoyo, D. M. Chamelia

Research output: Contribution to journalConference articlepeer-review

2 Citations (Scopus)

Abstract

This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.

Original languageEnglish
Article number012014
JournalIOP Conference Series: Earth and Environmental Science
Volume135
Issue number1
DOIs
Publication statusPublished - 28 Mar 2018
Event4th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management, ISOCEEN 2016 - Surabaya, Indonesia
Duration: 13 Dec 201613 Dec 2016

Fingerprint

Dive into the research topics of 'Fast Missile Boat Project Planning using CPM and What if Analysis Method'. Together they form a unique fingerprint.

Cite this