T1 - Fast Missile Boat Project Planning using CPM and What if Analysis Method
AU - Silvianita,
AU - Firmansyah, R.
AU - Rosyid, D. M.
AU - Suntoyo,
AU - Chamelia, D. M.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2018/3/28
Y1 - 2018/3/28
N2 - This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
AB - This paper discusses analysis of fast ship missile project planning with CPM and What If analysis.The poor performance can cause project delay and cost overruns, these two things often occur in a project management. Scheduling has an important role to control the project. Good scheduling is required because it will affect the product quality. Scheduling is useful to manage the activities so that the project completion time can be as short as possible and it is used to determine the costs of the project are in optimum condition. The alternatives that can be used to overcome the delay project namely increasing labor and equipment.Project planning can be done to determine whether the project is already in an optimum condition. Alternatives that can be used to overcome the delay in the project is to increase labor and equipment, the next is to look for the optimum solution taking into account the duration and gain of each alternative.
UR - http://www.scopus.com/inward/record.url?scp=85045689726&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/135/1/012014
DO - 10.1088/1755-1315/135/1/012014
M3 - Conference article
AN - SCOPUS:85045689726
SN - 1755-1307
VL - 135
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012014
T2 - 4th International Seminar on Ocean and Coastal Engineering, Environmental and Natural Disaster Management, ISOCEEN 2016
Y2 - 13 December 2016 through 13 December 2016
ER -