T1 - Gas Turbine Compressor Configuration Analysis for Production and Efficiency Optimization at PT Saka Indonesia Pangkah Ltd.
AU - Afandy, Muhammad Arif
AU - Ramadhani, Ifani P.
AU - Biyanto, Totok R.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2021/12/16
Y1 - 2021/12/16
N2 - Gas Turbine Compressors are used by Saka Indonesia Pangkah Ltd. in upstream oil and gas facilities either to boost hydrocarbon products to downstream facilities or to lift liquid hydrocarbon as a common artificial method. As production rate declining leads to gas supply deficiency to the compressors, the operating point move to surge line away from the best efficiency point. Gas feed shortage affecting the compressor's performance which contributed to head and flow capacity. This condition is then calculated and simulated using UNISIM Design Simulator to get optimum configuration results. The simulation was performed at the same gas turbine shaft power output of each compressor. Two cases of centrifugal compressors configuration with different functions and performance are studied. Due to process dynamic conditions, constraint parameter is considered as per desired operating point. This paper also analyses techno-economic aspects between individual and serial pipelines arrangement of the two compressors by evaluating operational data and design calculation. Subsequently, this study produces assessment observations associated with the compressor performance both in individual and serial configuration and eventually analyses the rate of fuel consumption in the gas turbines as the main driver. The case study shows serial arrangement between MPC-1 and GLC with same gas turbine shaft power as individual configuration can reduce fuel consumption up to 47 kg/hr. It saves as much as USD 7,569.96 per day at low demand and USD 7,569.96 at high-demand cases.
AB - Gas Turbine Compressors are used by Saka Indonesia Pangkah Ltd. in upstream oil and gas facilities either to boost hydrocarbon products to downstream facilities or to lift liquid hydrocarbon as a common artificial method. As production rate declining leads to gas supply deficiency to the compressors, the operating point move to surge line away from the best efficiency point. Gas feed shortage affecting the compressor's performance which contributed to head and flow capacity. This condition is then calculated and simulated using UNISIM Design Simulator to get optimum configuration results. The simulation was performed at the same gas turbine shaft power output of each compressor. Two cases of centrifugal compressors configuration with different functions and performance are studied. Due to process dynamic conditions, constraint parameter is considered as per desired operating point. This paper also analyses techno-economic aspects between individual and serial pipelines arrangement of the two compressors by evaluating operational data and design calculation. Subsequently, this study produces assessment observations associated with the compressor performance both in individual and serial configuration and eventually analyses the rate of fuel consumption in the gas turbines as the main driver. The case study shows serial arrangement between MPC-1 and GLC with same gas turbine shaft power as individual configuration can reduce fuel consumption up to 47 kg/hr. It saves as much as USD 7,569.96 per day at low demand and USD 7,569.96 at high-demand cases.
KW - Gas Turbine Compressor
KW - Serial Pipelines Arrangement
KW - Techno-Economic Analysis
KW - UNISIM Design Simulator
UR - http://www.scopus.com/inward/record.url?scp=85122203424&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/927/1/012031
DO - 10.1088/1755-1315/927/1/012031
M3 - Conference article
AN - SCOPUS:85122203424
SN - 1755-1307
VL - 927
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012031
T2 - 6th International Energy Conference, ASTECHNOVA 2021
Y2 - 24 August 2021 through 25 August 2021
ER -