T1 - Heuristic strategy cost and time optimization of high-rise building projects
AU - Waliulu, Yusroniya Eka Putri Rachman
AU - Suprobo, Priyo
AU - Adi, Tri Joko Wahyu
AU - Supani,
AU - Nurcahyo, Cahyono Bintang
AU - Bhaskara, Ida Bagus Abirama
N1 - Publisher Copyright:
© 2024 Author(s).
PY - 2024/2/6
Y1 - 2024/2/6
N2 - MIPA Tower experienced delays in the implementation of construction. The management needs to find the most appropriate solution to overcome the delay and how to model acceleration with minimum direct costs and acceleration results with optimum direct costs using heuristic methods (Genetics Algorithm) to represent the use of models in high-rise buildings in Indonesia. This study aims to create a construction project duration acceleration model and present a comprehensive performance model by identifying the modified parameter creation process, which integrates many parameters that are significant in determining crashing scenarios as a strategy to cost and time optimization The method used in this study is a Critical Path Method (CPM) with a Genetic Algorithm heuristic approach by performing the most optimum cost reduction on the critical path. The result of this research is an cost and time optimization model with a heuristic strategy (Genetic Algorithm) with acceleration and minimum direct costs that can be presented with a case study on the MIPA Tower as a high-rise building project. The best results were obtained with the addition of the minimum direct cost with an additional cost percentage of 0.5% of the initial worker's wage, can accelerate the duration of 7 days.
AB - MIPA Tower experienced delays in the implementation of construction. The management needs to find the most appropriate solution to overcome the delay and how to model acceleration with minimum direct costs and acceleration results with optimum direct costs using heuristic methods (Genetics Algorithm) to represent the use of models in high-rise buildings in Indonesia. This study aims to create a construction project duration acceleration model and present a comprehensive performance model by identifying the modified parameter creation process, which integrates many parameters that are significant in determining crashing scenarios as a strategy to cost and time optimization The method used in this study is a Critical Path Method (CPM) with a Genetic Algorithm heuristic approach by performing the most optimum cost reduction on the critical path. The result of this research is an cost and time optimization model with a heuristic strategy (Genetic Algorithm) with acceleration and minimum direct costs that can be presented with a case study on the MIPA Tower as a high-rise building project. The best results were obtained with the addition of the minimum direct cost with an additional cost percentage of 0.5% of the initial worker's wage, can accelerate the duration of 7 days.
UR - http://www.scopus.com/inward/record.url?scp=85185815436&partnerID=8YFLogxK
U2 - 10.1063/5.0144116
DO - 10.1063/5.0144116
M3 - Conference contribution
AN - SCOPUS:85185815436
T3 - AIP Conference Proceedings
BT - AIP Conference Proceedings
A2 - Kusuma, Andyka
A2 - Fatriansyah, Jaka Fajar
A2 - Dhelika, Radon
A2 - Pratama, Mochamad Adhiraga
A2 - Irwansyah, Ridho
A2 - Maknun, Imam Jauhari
A2 - Putra, Wahyuaji Narottama
A2 - Ardi, Romadhani
A2 - Harwahyu, Ruki
A2 - Harahap, Yulia Nurliani
A2 - Lischer, Kenny
PB - American Institute of Physics Inc.
T2 - 17th International Conference on Quality in Research, QiR 2021 in conjunction with the International Tropical Renewable Energy Conference 2021, I-Trec 2021 and the 2nd AUN-SCUD International Conference, CAIC-SIUD
Y2 - 13 October 2021 through 15 October 2021
ER -