Identifying factors affecting schedule and cost performance on building project

E. D. Widowati*, F. Rachmawati

*Corresponding author for this work

Research output: Contribution to journalConference articlepeer-review

3 Citations (Scopus)

Abstract

The project cost and schedule are two major factors which contribute to the project performance. Therefore, it is important to identify factors that affect project cost and schedule performance, which will, in turn, affect the whole project performance. Previous studies have listed many factors have a large impact on time and cost performance, however the discussion related to the relationship between influencing factors and performance parameters is still limited. This research identified and refined 15 influencing factors through literature review. Those factors were grouped into 3 group factors: resource, environmental and management. Then, further literature review further was conducted to determine the relationships between influencing factors with project time and cost performance. The study focuses on factors influencing project cost and time performance based on the physical progress and actual cost. The result shows that resource group is the most variable influencing physical progress, direct cost and indirect cost. While environment and management group influencing physical progress and indirect cost.

Original languageEnglish
Article number012022
JournalIOP Conference Series: Materials Science and Engineering
Volume930
Issue number1
DOIs
Publication statusPublished - 3 Nov 2020
Event4th International Conference on Civil Engineering Research, ICCER 2020 - Surabaya, Indonesia
Duration: 22 Jul 202023 Jul 2020

Fingerprint

Dive into the research topics of 'Identifying factors affecting schedule and cost performance on building project'. Together they form a unique fingerprint.

Cite this