TY - JOUR
T1 - Implementation of Value-based Decision on the Selection of Electrical System in a Superblock Property
AU - Utomo, Christiono
AU - Rahmawati, Yani
AU - Aqsha, Aqsha
AU - Amin, Nasycun
N1 - Publisher Copyright:
© 2024 American Institute of Physics Inc.. All rights reserved.
PY - 2024/8/22
Y1 - 2024/8/22
N2 - A superblock area certainly has a high complexity in the development process and later when it is operational, so it requires the right design initially. Ciwo Phase 3, especially on the electrical system, required selecting an appropriate design. In determining the design that will be used, there are several considerations, such as whether the decision is an alternative with the highest value and is acceptable to all stakeholders. The considerations in determining the design of this project are the initial cost, life cycle cost, recovery system, resistance to interference from outside, ease in maintenance, competitive price per kWh, availability of fuel sources, and energy saving during building operations. Based on the attributes, the methodology to select the best design for the electrical system in Ciwo Phase 3 is value-based, where the function and costs of each alternative will be compared. The Analytical Hierarchy Process (AHP) based satisficing option is applied. With the background and experience different for each stakeholder, an aggregation approach was used to decide based on the group. The results of these calculations will produce value-based decisions to determine the electrical system design alternatives at the Ciwo Phase 3. In this case, the option with the highest value can provide the highest satisfaction rates as increased functionality and low-cost.
AB - A superblock area certainly has a high complexity in the development process and later when it is operational, so it requires the right design initially. Ciwo Phase 3, especially on the electrical system, required selecting an appropriate design. In determining the design that will be used, there are several considerations, such as whether the decision is an alternative with the highest value and is acceptable to all stakeholders. The considerations in determining the design of this project are the initial cost, life cycle cost, recovery system, resistance to interference from outside, ease in maintenance, competitive price per kWh, availability of fuel sources, and energy saving during building operations. Based on the attributes, the methodology to select the best design for the electrical system in Ciwo Phase 3 is value-based, where the function and costs of each alternative will be compared. The Analytical Hierarchy Process (AHP) based satisficing option is applied. With the background and experience different for each stakeholder, an aggregation approach was used to decide based on the group. The results of these calculations will produce value-based decisions to determine the electrical system design alternatives at the Ciwo Phase 3. In this case, the option with the highest value can provide the highest satisfaction rates as increased functionality and low-cost.
UR - http://www.scopus.com/inward/record.url?scp=85202872201&partnerID=8YFLogxK
U2 - 10.1063/5.0231895
DO - 10.1063/5.0231895
M3 - Conference article
AN - SCOPUS:85202872201
SN - 0094-243X
VL - 3245
JO - AIP Conference Proceedings
JF - AIP Conference Proceedings
IS - 1
M1 - 030004
T2 - 1st International Conference on Innovations in Engineering, Science and Technology for Sustainable Development, ICEST 2023
Y2 - 15 November 2023 through 17 November 2023
ER -