T1 - Improving project efficiency using lean construction
AU - Karningsih, Putu Dana
AU - Anggrahini, Dewanti
AU - Karim, Mohammad Busyral
AU - Adhitama, Rizki
N1 - Publisher Copyright:
© 2017 IEEE.
PY - 2018/6/15
Y1 - 2018/6/15
N2 - Common problems on construction or project based industry are frequent deadlines delays, budget overruns and improper quality. Lean construction is one of approach for improving this situation by identifying and formulating recommendation to eliminate or reduce waste. It started by using Value Stream Mapping to understand the flow of information and material thus waste can be identified. Then, five why's analysis is utilized to get the root cause of waste. To formulate recommendation, the root cause of waste is ranked according to risk priority number. Finally, suggestion for reducing or eliminating these root cause of waste are provided accordingly. These approach is applied in two different organizations, an engineering procurement construction industry and a building construction company. The result of utilization of lean construction approach shows that the critical waste in the engineering procurement construction industry are waiting and correction. While in the building construction company, waiting is also identified as the critical waste and waste due to over processing. For both cases, root cause of waste of waiting have the highest risk priority number. Thus, specific recommendations to reduce these root cause are suggested accordingly.
AB - Common problems on construction or project based industry are frequent deadlines delays, budget overruns and improper quality. Lean construction is one of approach for improving this situation by identifying and formulating recommendation to eliminate or reduce waste. It started by using Value Stream Mapping to understand the flow of information and material thus waste can be identified. Then, five why's analysis is utilized to get the root cause of waste. To formulate recommendation, the root cause of waste is ranked according to risk priority number. Finally, suggestion for reducing or eliminating these root cause of waste are provided accordingly. These approach is applied in two different organizations, an engineering procurement construction industry and a building construction company. The result of utilization of lean construction approach shows that the critical waste in the engineering procurement construction industry are waiting and correction. While in the building construction company, waiting is also identified as the critical waste and waste due to over processing. For both cases, root cause of waste of waiting have the highest risk priority number. Thus, specific recommendations to reduce these root cause are suggested accordingly.
KW - lean construction
KW - root cause analysis
KW - value stream mapping
KW - waste
UR - http://www.scopus.com/inward/record.url?scp=85050026673&partnerID=8YFLogxK
U2 - 10.1109/ICAMIMIA.2017.8387613
DO - 10.1109/ICAMIMIA.2017.8387613
M3 - Conference contribution
AN - SCOPUS:85050026673
T3 - Proceeding - ICAMIMIA 2017: International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation
SP - 334
EP - 336
BT - Proceeding - ICAMIMIA 2017
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2017 International Conference on Advanced Mechatronics, Intelligent Manufacture, and Industrial Automation, ICAMIMIA 2017
Y2 - 12 October 2017 through 14 October 2017
ER -