Non-linear optimization of critical path method

  • Institut Teknologi Sepuluh Nopember

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

16 Citations (Scopus)

Abstract

Time and Cost Optimization (TCO) may be described as a process to identify appropriate construction activities to get the minimum duration of process and minimum additional cost which are needed. Critical Path Method (CPM) crashing project is one of methods to solve the time and cost optimization. But CPM crashing project needs some data to speed up the process business and in reality there are a lot of data which are represented using double timestamp event log. Therefore this paper represents a method to get data which are used in the crashing project. The data are obtained from average execution of activity duration in each case of event log. Then, to do the crashing project, this paper uses non-linear modeling to get minimum activity duration and minimum additional cost.

Original languageEnglish
Title of host publicationProceeding - 2017 3rd International Conference on Science in Information Technology
Subtitle of host publicationTheory and Application of IT for Education, Industry and Society in Big Data Era, ICSITech 2017
EditorsLala Septem Riza, Andri Pranolo, Aji Prasetyo Wibawa, Enjun Junaeti, Yaya Wihardi, Ummi Raba'ah Hashim, Shi-Jinn Horng, Rafal Drezewski, Heui Seok Lim, Goutam Chakraborty, Leonel Hernandez, Shah Nazir
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages90-96
Number of pages7
ISBN (Electronic)9781509058662
DOIs
Publication statusPublished - 1 Jul 2017
Event3rd International Conference on Science in Information Technology, ICSITech 2017 - Bandung, Indonesia
Duration: 25 Oct 201726 Oct 2017

Publication series

NameProceeding - 2017 3rd International Conference on Science in Information Technology: Theory and Application of IT for Education, Industry and Society in Big Data Era, ICSITech 2017
Volume2018-January

Conference

Conference3rd International Conference on Science in Information Technology, ICSITech 2017
Country/TerritoryIndonesia
CityBandung
Period25/10/1726/10/17

Keywords

  • CPM crashing project
  • double timestamp event log
  • non-linear modeling
  • time and cost optimization