Optimizing time and cost using goal programming and FMS scheduling

Shoffi Izza Sabilla, Riyanarto Sarno, Yutika Amelia Effendi

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

11 Citations (Scopus)

Abstract

Recently port container terminals plan to minimize dwelling time. In this context we utilize process business model to optimize time and cost of the activities. First, Flexible Manufacturing System (FMS) scheduling algorithm is employed to generate alternative routes, which have ascending order of times. Then, the time and cost of the alternative routes became to input of Goal Programming, which obtain the best route with optimal time and cost. The result of this research showed that scheduling can increase work time so that the execution time becomes more optimal, whereas Goal Programming lower the production costs in accordance with the desired target in the company.

Original languageEnglish
Title of host publication2018 International Conference on Information and Communications Technology, ICOIACT 2018
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages244-249
Number of pages6
ISBN (Electronic)9781538609545
DOIs
Publication statusPublished - 26 Apr 2018
Event1st International Conference on Information and Communications Technology, ICOIACT 2018 - Yogyakarta, Indonesia
Duration: 6 Mar 20187 Mar 2018

Publication series

Name2018 International Conference on Information and Communications Technology, ICOIACT 2018
Volume2018-January

Conference

Conference1st International Conference on Information and Communications Technology, ICOIACT 2018
Country/TerritoryIndonesia
CityYogyakarta
Period6/03/187/03/18

Keywords

  • Goal Programming
  • Optimization
  • Scheduling

Fingerprint

Dive into the research topics of 'Optimizing time and cost using goal programming and FMS scheduling'. Together they form a unique fingerprint.

Cite this