Performance evaluation of hydropower operation for nickel smelter: A case study of Larona river cascade hydroelectric power plant

  • Institut Teknologi Sepuluh Nopember

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

Function of hydropower is very important in supporting the nickel smelter process. Process of nickel smelter required huge electricity power. Low operating cost can be achieved by maximizing the utilization of hydropower. The main goal of this study to evaluate the non-financial and financial aspect for cascade hydroelectric power plant along the Larona River to deliver electricity for nickel smelter process. Non-financial aspect evaluates the efficiency and operation performance of the cascade hydroelectric power plant compare with the nickel production from the smelting plant. Financial evaluation measures the performance of economic operation of the cascade hydroelectric power plant compare with the utilization of diesel plant. The evaluation will involve input-output data from the cascade hydropower station along the Larona River basin and the nickel production from the smelter process. Cascade hydroelectric power plant along the Larona River operated by PT Vale Indonesia, global nickel mining company, consist of three power station (Larona HEPP, Balambano HEPP and Karebbe HEPP) with maximum total installed capacity 365 MW. The result of this study shows that the excellent efficiency of water consumption. Cascade hydroelectric power plant only consume additional water 7.62% to generate additional power 32.7%. It was found, the additional 90 MW from Karebbe HEPP as the last of the cascade hydroelectric power plant in Larona River is not significant impact to increase the average nickel production. However, the significant impact cost saving 63% to decrease the electricity production cost by reducing the utilization of diesel plant.

Original languageEnglish
Title of host publicationAdvanced Industrial Technology in Engineering Physics
EditorsAgus Muhamad Hatta, Katherin Indriawati, Gunawan Nugroho, Totok Ruki Biyanto, Dhany Arifianto, Doty Dewi Risanti, Sonny Irawan
PublisherAmerican Institute of Physics Inc.
ISBN (Electronic)9780735418189
DOIs
Publication statusPublished - 29 Mar 2019
Event2nd Engineering Physics International Conference 2018, EPIC 2018 - Surabaya, Indonesia
Duration: 31 Oct 20182 Nov 2018

Publication series

NameAIP Conference Proceedings
Volume2088
ISSN (Print)0094-243X
ISSN (Electronic)1551-7616

Conference

Conference2nd Engineering Physics International Conference 2018, EPIC 2018
Country/TerritoryIndonesia
CitySurabaya
Period31/10/182/11/18

Keywords

  • Cascade hydroelectric power plant
  • Efficiency evaluation
  • Nickel smelter
  • Performance economic evaluation