TY - GEN
T1 - Prioritizing the smart operation room development for smart city based on analytical hierarchy process
AU - Kurniawan, Fachrul
AU - Nugroho, Supeno Mardi Susiki
AU - Hariadi, Mochamad
PY - 2017
Y1 - 2017
N2 - Building infrastructure for implementing smart city system in Makassar had been begun by building smart operation room. Main function of this smart operation is in order that the mayor can see the whole city activities directly (real time), that monitoring on development program planned by municipal government could better. There are four prominent activities in building this smart operation room; they are building data center, distribution of 69 CCTV to all city angles (stage I), next the development of wall monitoring and the last is building operation room. These four activities should be able to be operated in phases that it would not disrupt financial, human resource, and time target determined by the foreman. Therefore, there is needed election on priority building based on integrity determined. The criteria is good, adequate, and less where the determination is based on sub criteria of planning design, time, financial, and workers. This study resulted 3 recommendations labeled with a, b, c where the best level is B recommendation by value of 0.72, C recommendation by value of 0.66 and the last is A recommendation by value of 0.55.
AB - Building infrastructure for implementing smart city system in Makassar had been begun by building smart operation room. Main function of this smart operation is in order that the mayor can see the whole city activities directly (real time), that monitoring on development program planned by municipal government could better. There are four prominent activities in building this smart operation room; they are building data center, distribution of 69 CCTV to all city angles (stage I), next the development of wall monitoring and the last is building operation room. These four activities should be able to be operated in phases that it would not disrupt financial, human resource, and time target determined by the foreman. Therefore, there is needed election on priority building based on integrity determined. The criteria is good, adequate, and less where the determination is based on sub criteria of planning design, time, financial, and workers. This study resulted 3 recommendations labeled with a, b, c where the best level is B recommendation by value of 0.72, C recommendation by value of 0.66 and the last is A recommendation by value of 0.55.
KW - Development
KW - Priority
KW - Smarcity
KW - Smart-operation-room
UR - http://www.scopus.com/inward/record.url?scp=85041196908&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:85041196908
T3 - Lecture Notes in Engineering and Computer Science
SP - 409
EP - 413
BT - Proceedings of the World Congress on Engineering 2017, WCE 2017
A2 - Hukins, David WL
A2 - Korsunsky, A. M.
A2 - Gelman, Len
A2 - Ao, S. I.
A2 - Hunter, Andrew
PB - Newswood Limited
T2 - 2017 World Congress on Engineering, WCE 2017
Y2 - 5 July 2017 through 7 July 2017
ER -