TY - GEN
T1 - Procurement strategy and supply risk analysis of coal by considering price fluctuation and supplier delivery time
AU - Wibowo, Arie Bagus
AU - Pujawan, I. Nyoman
N1 - Publisher Copyright:
© IEOM Society International.
PY - 2018
Y1 - 2018
N2 - Under price uncertainty, the decision on how long a supply contract for a certain commodity should be, is an important question a decision maker has to address. The length of supply contract will affect both the financial aspect as well as the risks. This research will discuss about the selection of 3 (three) procurement strategies namely long-term procurement strategy, short-term procurement strategy, and mixed strategy by considering uncertainty factors such as commodity price, supplier delivery time and quality in which the three factors are considered to be uncertain. We compare the benefits, costs and risks associated with each strategy. We use the Monte Carlo Simulation method to represent the level of uncertainty of all variables. Cost-Benefit Analysis is used to calculate the economic aspects while the procurement supply risk analysis is used to determine the risk associated with each strategy. The results show that the mixed strategy of 24-month and 6-month outperformed other strategies.
AB - Under price uncertainty, the decision on how long a supply contract for a certain commodity should be, is an important question a decision maker has to address. The length of supply contract will affect both the financial aspect as well as the risks. This research will discuss about the selection of 3 (three) procurement strategies namely long-term procurement strategy, short-term procurement strategy, and mixed strategy by considering uncertainty factors such as commodity price, supplier delivery time and quality in which the three factors are considered to be uncertain. We compare the benefits, costs and risks associated with each strategy. We use the Monte Carlo Simulation method to represent the level of uncertainty of all variables. Cost-Benefit Analysis is used to calculate the economic aspects while the procurement supply risk analysis is used to determine the risk associated with each strategy. The results show that the mixed strategy of 24-month and 6-month outperformed other strategies.
KW - Cost-Benefit Analysis
KW - Monte Carlo Simulation
KW - Procurement
KW - Procurement strategy
KW - Risk analysis
UR - https://www.scopus.com/pages/publications/85051478389
M3 - Conference contribution
AN - SCOPUS:85051478389
SN - 9781532359446
T3 - Proceedings of the International Conference on Industrial Engineering and Operations Management
SP - 2903
EP - 2913
BT - Proceedings of the International Conference on Industrial Engineering and Operations Management, IEOM 2018
PB - IEOM Society
T2 - 8th International Conference on Industrial Engineering and Operations Management, IEOM 2018
Y2 - 6 March 2018 through 8 March 2018
ER -