Abstract
This paper examines the factors determining the issuance of project-based Sukuk for sustainable refinancing of toll road development in Indonesia. A questionnaire survey was used to obtain the factors that determine the issuance of project-based Sukuk. Experts and practitioners were consulted to identify and analyze the factors influencing the issuance of project-based Sukuk. The questionnaire participants included experienced infrastructure practitioners, regulators, and researchers. The results show that twelve indicators explain the decision to issue project-based Sukuk. Among them, the exchange rate is the most significant influence, with a loading factor value of 0.935, indicating that exchange rates affect Sukuk issuance, followed by the high cost of funds with a value of 0.857, which suggests that the high cost of funding is a strong reason for companies to choose Sukuk as an alternative for infrastructure refinancing. Other indicators, such as the inflation rate with a value of 0.835 and firm competence with a value of 0.809, also have a significant influence. This paper provides valuable findings and references for a toll road project-based Sukuk refinancing scheme to take over a stalled toll road project. The revealed factors benefit toll road stakeholders, such as business entities and the government, when preparing a refinancing scheme.
| Original language | English |
|---|---|
| Pages (from-to) | 243-257 |
| Number of pages | 15 |
| Journal | Edelweiss Applied Science and Technology |
| Volume | 9 |
| Issue number | 3 |
| DOIs | |
| Publication status | Published - 2025 |
Keywords
- Factor Analysis
- Indonesia
- Project-based Sukuk
- Refinancing
- Sustainability
- Toll Road
Fingerprint
Dive into the research topics of 'Project-based Sukuk issuance for sustainable toll road refinancing in Indonesia: A confirmatory factor analysis'. Together they form a unique fingerprint.Cite this
- APA
- Author
- BIBTEX
- Harvard
- Standard
- RIS
- Vancouver