TY - JOUR
T1 - Railway capacity analysis using Indonesian method and UIC code 405 method
AU - Widyastuti, H.
AU - Budhi, W. S.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2020/11/3
Y1 - 2020/11/3
N2 - The government has been constructing double track at Surabaya-Madiun segment to improve railway operations performance. Accordingly, after the double track has been constructed in this segment, it is necessary to analyze existing railway capacity to determine the effect of development as a cost-effective solution. Nowadays, Indonesia is using the Indonesian method as a capacity analysis method and only provides railway capacity analysis using fixed block. On the other hand, another method such as the UIC method has different variables. Therefore in this study, the railway capacity analysis uses two analytic methods that are Indonesian and UIC code 405. The analysis result of both methods shows an improvement in railway capacity because of the double-track construction. These two methods have different results due to each variable. Moreover, one of the UIC variables is additional time due to maintenance differentiated based on its utilization. Utilization in the UIC method is differenced based on its operational conditions by peak and non-peak hours or normal conditions that may also affect the capacity. It also happens in MRT Jakarta operating systems in which the headway is divided into peak and non-peak hours. Accordingly, this study could be a preliminary study for policymakers to analyze capacity in the next near future condition.
AB - The government has been constructing double track at Surabaya-Madiun segment to improve railway operations performance. Accordingly, after the double track has been constructed in this segment, it is necessary to analyze existing railway capacity to determine the effect of development as a cost-effective solution. Nowadays, Indonesia is using the Indonesian method as a capacity analysis method and only provides railway capacity analysis using fixed block. On the other hand, another method such as the UIC method has different variables. Therefore in this study, the railway capacity analysis uses two analytic methods that are Indonesian and UIC code 405. The analysis result of both methods shows an improvement in railway capacity because of the double-track construction. These two methods have different results due to each variable. Moreover, one of the UIC variables is additional time due to maintenance differentiated based on its utilization. Utilization in the UIC method is differenced based on its operational conditions by peak and non-peak hours or normal conditions that may also affect the capacity. It also happens in MRT Jakarta operating systems in which the headway is divided into peak and non-peak hours. Accordingly, this study could be a preliminary study for policymakers to analyze capacity in the next near future condition.
UR - http://www.scopus.com/inward/record.url?scp=85096850016&partnerID=8YFLogxK
U2 - 10.1088/1757-899X/930/1/012059
DO - 10.1088/1757-899X/930/1/012059
M3 - Conference article
AN - SCOPUS:85096850016
SN - 1757-8981
VL - 930
JO - IOP Conference Series: Materials Science and Engineering
JF - IOP Conference Series: Materials Science and Engineering
IS - 1
M1 - 012059
T2 - 4th International Conference on Civil Engineering Research, ICCER 2020
Y2 - 22 July 2020 through 23 July 2020
ER -