TY - JOUR
T1 - Rapid Assessment for Emergency Infrastructures in Responding Flood related to Mining Activity
T2 - 4th Sustainability and Resilience of Coastal Management, SRCM 2023
AU - Pamungkas, Adjie
AU - Elysiyah, Ita
AU - Mahardhika, Gita Rama
AU - Mauludya, Yanwa Evia Java
AU - Rahmawati, Dian
AU - Wahyuni, Santi
N1 - Publisher Copyright:
© The Authors
PY - 2024/1/23
Y1 - 2024/1/23
N2 - Flooding has become the most frequent and impactful disaster events in the Indonesian cities. The Indonesian disaster board also noted that flood events has increasing pattern for today and future time. One of the strategic ways to decrease the impact of flooding is delivering the emergency infrastructures to the needs immediately. The faster delivery makes less impact of disaster events. Therefore, this paper synthesizes a rapid model of assessment from the full assessment of emergency infrastructure need in Sidoarjo Flooding 2020. During the synthesize, the model can reduce duration of assessment from 148 days to four days only. Within the time, eight main steps include finding relevant emergency infrastructures, determining emergency infrastructures needed, assessing emergency infrastructures needed and confirming the actual emergency infrastructure needed. Those eight steps should be taken by encouraging more FGD and in-depth interviews for key relevant stakeholders, guided by specific checklist and filling the gap forms. Strict forms and guidelines provided to help the process in achieving four days assessment period. Consequently, the authorities can use the output assessment for emergency infrastructure program delivery starting from the fifth days after the events.
AB - Flooding has become the most frequent and impactful disaster events in the Indonesian cities. The Indonesian disaster board also noted that flood events has increasing pattern for today and future time. One of the strategic ways to decrease the impact of flooding is delivering the emergency infrastructures to the needs immediately. The faster delivery makes less impact of disaster events. Therefore, this paper synthesizes a rapid model of assessment from the full assessment of emergency infrastructure need in Sidoarjo Flooding 2020. During the synthesize, the model can reduce duration of assessment from 148 days to four days only. Within the time, eight main steps include finding relevant emergency infrastructures, determining emergency infrastructures needed, assessing emergency infrastructures needed and confirming the actual emergency infrastructure needed. Those eight steps should be taken by encouraging more FGD and in-depth interviews for key relevant stakeholders, guided by specific checklist and filling the gap forms. Strict forms and guidelines provided to help the process in achieving four days assessment period. Consequently, the authorities can use the output assessment for emergency infrastructure program delivery starting from the fifth days after the events.
KW - emergency infrastructure
KW - flooding
KW - program delivery
KW - rapid assessment
UR - http://www.scopus.com/inward/record.url?scp=85185605871&partnerID=8YFLogxK
U2 - 10.1051/bioconf/20248908001
DO - 10.1051/bioconf/20248908001
M3 - Conference article
AN - SCOPUS:85185605871
SN - 2273-1709
VL - 89
JO - BIO Web of Conferences
JF - BIO Web of Conferences
M1 - 08001
Y2 - 29 November 2023
ER -