TY - GEN
T1 - Review of Previous Researches’ Methodology Stakeholder Integration in Connected Construction
AU - Mertha, Dewa Made Satriya Wibawa
AU - Utomo, Christiono
AU - Astarini, Sulfiah Dwi
AU - Nurcahyo, Cahyono Bintang
AU - Nahdiyah, Maulita
N1 - Publisher Copyright:
© The Author(s), under exclusive license to Springer Nature Singapore Pte Ltd. 2024.
PY - 2024
Y1 - 2024
N2 - Connected construction is a concept that combines all stages of construction and uses high-end technology to solve problems in the construction industry. Throughout the life cycle's planning, construction, and operation phases, each stage has a different stakeholder and role. The involvement of different stakeholders at each stage of connected construction is still a problem. The discrepancy between planning and output will be a consequence if the interaction between stakeholders at each stage is not properly connected. Several studies on stakeholder integration have been carried out using various methods but are still rarely found in the context of connected construction. So it is important to know the appropriate research method for stakeholder integration in connected construction. This study aims to identify the research methods used in stakeholder integration in connected construction, using determined 20 papers on the topic of stakeholder integration in the construction industry. The result of the study is the mapping of previous research based on the method used. This mapping will be useful for researchers to conduct the methodology of the research, especially on the topic of stakeholder integration in connected construction.
AB - Connected construction is a concept that combines all stages of construction and uses high-end technology to solve problems in the construction industry. Throughout the life cycle's planning, construction, and operation phases, each stage has a different stakeholder and role. The involvement of different stakeholders at each stage of connected construction is still a problem. The discrepancy between planning and output will be a consequence if the interaction between stakeholders at each stage is not properly connected. Several studies on stakeholder integration have been carried out using various methods but are still rarely found in the context of connected construction. So it is important to know the appropriate research method for stakeholder integration in connected construction. This study aims to identify the research methods used in stakeholder integration in connected construction, using determined 20 papers on the topic of stakeholder integration in the construction industry. The result of the study is the mapping of previous research based on the method used. This mapping will be useful for researchers to conduct the methodology of the research, especially on the topic of stakeholder integration in connected construction.
KW - Connected
KW - Construction
KW - Integration
KW - Stakeholders
UR - http://www.scopus.com/inward/record.url?scp=85174438706&partnerID=8YFLogxK
U2 - 10.1007/978-981-99-4049-3_55
DO - 10.1007/978-981-99-4049-3_55
M3 - Conference contribution
AN - SCOPUS:85174438706
SN - 9789819940486
T3 - Lecture Notes in Civil Engineering
SP - 719
EP - 728
BT - Proceedings of 5th International Conference on Civil Engineering and Architecture - Proceedings of ICCEA 2022
A2 - Kang, Thomas
PB - Springer Science and Business Media Deutschland GmbH
T2 - 5th International Conference on Civil Engineering and Architecture, ICCEA 2022
Y2 - 16 December 2022 through 18 December 2022
ER -