T1 - Risk Analysis of Return Support Material on Gas Compressor Platform Project
AU - Silvianita,
AU - Aulia, B. U.
AU - Khakim, M. L.N.
AU - Rosyid, Daniel M.
N1 - Publisher Copyright:
© Published under licence by IOP Publishing Ltd.
PY - 2017/8/17
Y1 - 2017/8/17
N2 - On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000,.
AB - On a fixed platforms project are not only carried out by a contractor, but two or more contractors. Cooperation in the construction of fixed platforms is often not according to plan, it is caused by several factors. It takes a good synergy between the contractor to avoid miss communication may cause problems on the project. For the example is about support material (sea fastening, skid shoe and shipping support) used in the process of sending a jacket structure to operation place often does not return to the contractor. It needs a systematic method to overcome the problem of support material. This paper analyses the causes and effects of GAS Compressor Platform that support material is not return, using Fault Tree Analysis (FTA) and Event Tree Analysis (ETA). From fault tree analysis, the probability of top event is 0.7783. From event tree analysis diagram, the contractors lose Rp.350.000.000, - to Rp.10.000.000.000,.
UR - http://www.scopus.com/inward/record.url?scp=85028604472&partnerID=8YFLogxK
U2 - 10.1088/1755-1315/79/1/012003
DO - 10.1088/1755-1315/79/1/012003
M3 - Conference article
AN - SCOPUS:85028604472
SN - 1755-1307
VL - 79
JO - IOP Conference Series: Earth and Environmental Science
JF - IOP Conference Series: Earth and Environmental Science
IS - 1
M1 - 012003
T2 - CITIES 2016 International Conference: Coastal Planning for Sustainable Maritime Development
Y2 - 18 October 2016
ER -