Schedule risk analysis of southern mainway construction in jember regency

Research output: Contribution to journalConference articlepeer-review

Abstract

In Jember Regency, it has been built Southern Cross Road (JLS) as part of regional project. On the implementation of previous construction, there were still some events which gave negative impact to the project. The purpose of this research is to analyze risk and its effect on schedule at the construction phase of JLS at Jember Regency. Risk identification process is carried out by site survey, literature studies and supporting data. The use of Probability and Impact Matrix were aimed to obtain the level of risk. Based on the analysis, it was obtained six highest risk that could affecting schedule, such as difficult access locations, heavy rains, increases of material price, broken road pavement work, change order, and work accident. Risk responses were proposed by applying agreement to guarantee stock and price of materials, prioritized drainage, and constructing bridge to solve difficult access. An intense coordination in the site, routine checks of quality, manufacturing of retailing walls were also needed to reduce possibility of distruption to pavement work. To avoid work accident, it is needed to socialize about harsh terrain condition, mutual allertness among supervisor, worker and the others, and also all personals must comply with savety rules.

Original languageEnglish
Article number012023
JournalIOP Conference Series: Materials Science and Engineering
Volume267
Issue number1
DOIs
Publication statusPublished - 23 Nov 2017
EventInternational Conference of Applied Science and Technology for Infrastructure Engineering 2017, ICASIE 2017 - Surabaya, East Java, Indonesia
Duration: 5 Aug 2017 → …

Fingerprint

Dive into the research topics of 'Schedule risk analysis of southern mainway construction in jember regency'. Together they form a unique fingerprint.

Cite this