T1 - Time and cost optimization in feasibility test of CCTV project using CPM and PERT
AU - Bintang, Muhammad Ridho
AU - Sungkono, Kelly Rossa
AU - Sarno, Riyanarto
N1 - Publisher Copyright:
© 2019 IEEE
PY - 2019/7
Y1 - 2019/7
N2 - Completing a closed-circuit television (CCTV) project on time and within budget is not an easy thing. Scheduling and planning in the CCTV project hold an essential role in predicting the aspects of time and project costs. The success or failure of a project can be viewed on the initial process of CCTV planning, including projecting the crash because of the absence of optimization in terms of plan which led to the in the effectively of the project. This research aims to find the trade-off between cost and optimal time required to complete the project of CCTV by using Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT). CPM and PERT are used to make working time and cost of the project more effective and efficient. The evaluation of this research uses data about the project time and expenses from computer vision (CV) Aditya IT Consultant, a software house based in Kediri, East Java. The expected duration is 73 days, and the normal cost is IDR 207,858,300. However, by using CPM and PERT, the optimal time is 48 days with the price IDR 168,608,300. The conclusion is CPM and PERT make the working time and cost of a project effective and efficient by reducing the completion time and cost up to 25 days and IDR 39,250,000.
AB - Completing a closed-circuit television (CCTV) project on time and within budget is not an easy thing. Scheduling and planning in the CCTV project hold an essential role in predicting the aspects of time and project costs. The success or failure of a project can be viewed on the initial process of CCTV planning, including projecting the crash because of the absence of optimization in terms of plan which led to the in the effectively of the project. This research aims to find the trade-off between cost and optimal time required to complete the project of CCTV by using Critical Path Method (CPM) and Project Evaluation and Review Technique (PERT). CPM and PERT are used to make working time and cost of the project more effective and efficient. The evaluation of this research uses data about the project time and expenses from computer vision (CV) Aditya IT Consultant, a software house based in Kediri, East Java. The expected duration is 73 days, and the normal cost is IDR 207,858,300. However, by using CPM and PERT, the optimal time is 48 days with the price IDR 168,608,300. The conclusion is CPM and PERT make the working time and cost of a project effective and efficient by reducing the completion time and cost up to 25 days and IDR 39,250,000.
KW - CCTV Project
KW - Critical Path Method (CPM)
KW - Project Evaluation
KW - Review Technique (PERT)
UR - http://www.scopus.com/inward/record.url?scp=85077957917&partnerID=8YFLogxK
U2 - 10.1109/ICOIACT46704.2019.8938466
DO - 10.1109/ICOIACT46704.2019.8938466
M3 - Conference contribution
AN - SCOPUS:85077957917
T3 - 2019 International Conference on Information and Communications Technology, ICOIACT 2019
SP - 678
EP - 683
BT - 2019 International Conference on Information and Communications Technology, ICOIACT 2019
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2nd International Conference on Information and Communications Technology, ICOIACT 2019
Y2 - 24 July 2019 through 25 July 2019
ER -