Time and Cost Optimization Using Dynamic Programming and FMS Scheduling

Chyntia Kumalasari Puteri, Riyanarto Sarno, Gita Intani Budiawati

Research output: Chapter in Book/Report/Conference proceedingConference contributionpeer-review

1 Citation (Scopus)

Abstract

Quality of information system at a company in Surabaya which is engaged in buying and selling wireless devices greatly affect the business performance of the company. One of the processes that support the running of this company is the process of Return Material Automatically (RMA). In this study, a RMA model business processes used by the authors for optimizing time and costs. To generate an alternative direction, the author uses an scheduling algorithm referred to Flexible Manufacturing System (FMS). After a time the optimal alternative route is obtained, it become input of programming objectives that will be calculated with Dynamic Programming, then the best route will be obtained using the optimal time and cost. The results of this study indicate that FMS Scheduling can be used to optimize time, and Dynamic Programming can be used to optimize the cost of this research. The results show that Trace 2 provides the optimal results compared to Trace 1.

Original languageEnglish
Title of host publicationProceedings - 2018 International Seminar on Application for Technology of Information and Communication
Subtitle of host publicationCreative Technology for Human Life, iSemantic 2018
PublisherInstitute of Electrical and Electronics Engineers Inc.
Pages447-452
Number of pages6
ISBN (Electronic)9781538674864
DOIs
Publication statusPublished - 27 Nov 2018
Event3rd International Seminar on Application for Technology of Information and Communication, iSemantic 2018 - Semarang, Indonesia
Duration: 21 Sept 201822 Sept 2018

Publication series

NameProceedings - 2018 International Seminar on Application for Technology of Information and Communication: Creative Technology for Human Life, iSemantic 2018

Conference

Conference3rd International Seminar on Application for Technology of Information and Communication, iSemantic 2018
Country/TerritoryIndonesia
CitySemarang
Period21/09/1822/09/18

Keywords

  • Dynamic Programming
  • FMS Scheduling
  • Optimizing

Fingerprint

Dive into the research topics of 'Time and Cost Optimization Using Dynamic Programming and FMS Scheduling'. Together they form a unique fingerprint.

Cite this