TY - GEN
T1 - Time and Cost Optimization Using Dynamic Programming and FMS Scheduling
AU - Kumalasari Puteri, Chyntia
AU - Sarno, Riyanarto
AU - Intani Budiawati, Gita
N1 - Publisher Copyright:
© 2018 IEEE.
PY - 2018/11/27
Y1 - 2018/11/27
N2 - Quality of information system at a company in Surabaya which is engaged in buying and selling wireless devices greatly affect the business performance of the company. One of the processes that support the running of this company is the process of Return Material Automatically (RMA). In this study, a RMA model business processes used by the authors for optimizing time and costs. To generate an alternative direction, the author uses an scheduling algorithm referred to Flexible Manufacturing System (FMS). After a time the optimal alternative route is obtained, it become input of programming objectives that will be calculated with Dynamic Programming, then the best route will be obtained using the optimal time and cost. The results of this study indicate that FMS Scheduling can be used to optimize time, and Dynamic Programming can be used to optimize the cost of this research. The results show that Trace 2 provides the optimal results compared to Trace 1.
AB - Quality of information system at a company in Surabaya which is engaged in buying and selling wireless devices greatly affect the business performance of the company. One of the processes that support the running of this company is the process of Return Material Automatically (RMA). In this study, a RMA model business processes used by the authors for optimizing time and costs. To generate an alternative direction, the author uses an scheduling algorithm referred to Flexible Manufacturing System (FMS). After a time the optimal alternative route is obtained, it become input of programming objectives that will be calculated with Dynamic Programming, then the best route will be obtained using the optimal time and cost. The results of this study indicate that FMS Scheduling can be used to optimize time, and Dynamic Programming can be used to optimize the cost of this research. The results show that Trace 2 provides the optimal results compared to Trace 1.
KW - Dynamic Programming
KW - FMS Scheduling
KW - Optimizing
UR - http://www.scopus.com/inward/record.url?scp=85060034098&partnerID=8YFLogxK
U2 - 10.1109/ISEMANTIC.2018.8549734
DO - 10.1109/ISEMANTIC.2018.8549734
M3 - Conference contribution
AN - SCOPUS:85060034098
T3 - Proceedings - 2018 International Seminar on Application for Technology of Information and Communication: Creative Technology for Human Life, iSemantic 2018
SP - 447
EP - 452
BT - Proceedings - 2018 International Seminar on Application for Technology of Information and Communication
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 3rd International Seminar on Application for Technology of Information and Communication, iSemantic 2018
Y2 - 21 September 2018 through 22 September 2018
ER -