TY - GEN
T1 - UCPabc as an integration model for software cost estimation
AU - Dewi, Renny Sari
AU - Prassida, Grandys Frieska
AU - Sholiq,
AU - Subriadi, Apol Pribadi
N1 - Publisher Copyright:
© 2016 IEEE.
PY - 2017/2/13
Y1 - 2017/2/13
N2 - This study aims to construct a scientific model in estimating effort and cost of software development projects. Use Case Points (UCP) is very important method to estimate the total effort in software development projects. While the technique of Activity-based Costing (ABC) serves as the calculation of costs in each of the activities, especially the allocation of project resources. ABC technique consists of five stages are estimates based on the allocation of its resources, by having the total of UCP first. The result of this research is a proposed model of integration between UCP and ABC method or also called UCPabc. UCPabc model testing performed on five software development project small-medium scales. The results of test evaluations UCPabc estimation model with the company's actual cost turned out to be quite impressive, which the deviation only 2.16 percent. Meanwhile, the company forecast profit margin of 30.4 percent between total project contract value with cost estimation by using UCPabc.
AB - This study aims to construct a scientific model in estimating effort and cost of software development projects. Use Case Points (UCP) is very important method to estimate the total effort in software development projects. While the technique of Activity-based Costing (ABC) serves as the calculation of costs in each of the activities, especially the allocation of project resources. ABC technique consists of five stages are estimates based on the allocation of its resources, by having the total of UCP first. The result of this research is a proposed model of integration between UCP and ABC method or also called UCPabc. UCPabc model testing performed on five software development project small-medium scales. The results of test evaluations UCPabc estimation model with the company's actual cost turned out to be quite impressive, which the deviation only 2.16 percent. Meanwhile, the company forecast profit margin of 30.4 percent between total project contract value with cost estimation by using UCPabc.
KW - UCPabc
KW - activity based costing
KW - integration model
KW - software cost estimation
KW - software effort estimation
KW - use case points
UR - http://www.scopus.com/inward/record.url?scp=85016167668&partnerID=8YFLogxK
U2 - 10.1109/ICSITech.2016.7852631
DO - 10.1109/ICSITech.2016.7852631
M3 - Conference contribution
AN - SCOPUS:85016167668
T3 - Proceeding - 2016 2nd International Conference on Science in Information Technology, ICSITech 2016: Information Science for Green Society and Environment
SP - 187
EP - 192
BT - Proceeding - 2016 2nd International Conference on Science in Information Technology, ICSITech 2016
PB - Institute of Electrical and Electronics Engineers Inc.
T2 - 2nd International Conference on Science in Information Technology, ICSITech 2016
Y2 - 26 October 2016 through 27 October 2016
ER -