TY - JOUR
T1 - Waste analysis on the production floor and proposed improvements using a lean manufacturing approach aluminium manufacturing company in East Java, Indonesia
AU - Anshori, Moch
AU - Suparno,
AU - Arif, Donny
N1 - Publisher Copyright:
Copyright © 2025 Inderscience Enterprises Ltd.
PY - 2025
Y1 - 2025
N2 - This study aims to analyse waste on the production floor, causing delays in the completion of the production process and affecting product delivery to consumers. In addition, this research is also used to explain the types of waste and provide alternative improvements to reduce waste on the production floor using a lean manufacturing approach. Using the value stream mapping method, researchers mapped the flow of information and materials in the production process. Furthermore, the actual condition of the company is described in the current state stream map using the 5W-1H method of waste identification tool. This study found that there were a waste of defective goods in the frame, wastage in the weaving repair process and activities to find boxes and waste of transportation on the production floor. Implementing the proposed improvement is expected to reduce the waste that occurs to reduce the production lead time.
AB - This study aims to analyse waste on the production floor, causing delays in the completion of the production process and affecting product delivery to consumers. In addition, this research is also used to explain the types of waste and provide alternative improvements to reduce waste on the production floor using a lean manufacturing approach. Using the value stream mapping method, researchers mapped the flow of information and materials in the production process. Furthermore, the actual condition of the company is described in the current state stream map using the 5W-1H method of waste identification tool. This study found that there were a waste of defective goods in the frame, wastage in the weaving repair process and activities to find boxes and waste of transportation on the production floor. Implementing the proposed improvement is expected to reduce the waste that occurs to reduce the production lead time.
KW - Indonesia
KW - aluminium manufacturing
KW - lean manufacturing
KW - value stream mapping
KW - waste production floor
UR - http://www.scopus.com/inward/record.url?scp=85215577417&partnerID=8YFLogxK
U2 - 10.1504/IJPMB.2025.143614
DO - 10.1504/IJPMB.2025.143614
M3 - Article
AN - SCOPUS:85215577417
SN - 1460-6739
VL - 19
SP - 131
EP - 146
JO - International Journal of Process Management and Benchmarking
JF - International Journal of Process Management and Benchmarking
IS - 1
ER -